The current master planning process will take place in phases. The current schedule for the master planning process is listed below. Check back to get an update on events as they happen.
| Phase 1: Observations and Principles Phase | |
| Includes data gathering, programming/planning methods, establishing objectives, goals and principles. This phase is currently underway. |
|
| Phase 2: Precinct Walk Phase | |
Includes walking of the core campus and edges on Sept. 26 and 27, from 8-11 a.m.
Public meeting scheduled for Sept. 27, at 7 p.m.
Click here to see the Power Point presentation from the Sept. 27 public meeting |
|
| Phase 3: Concepts Phase | |
| Includes preliminary planning, programming results, preliminary design guidelines report and public meeting. Public meeting tentatively scheduled for Jan. 31, 2007 at 7 p.m. | |
| Phase 4: Final Plan Phase | |
| Includes a draft of the master plan and draft of design guidelines leading to the final master plan presentations, documentation, a trustee and public meeting. Tentatively scheduled for April 2007. | |